图书简介
This book focuses primarily on both technical and business aspects needed to select, design, develop and deploy control application (or product) successfully for multiple components in building systems. Designing and deploying a control application require multiple steps such as sensing, system dynamics modelling, algorithms, and testing. This may involve choosing an appropriate methodology and technique at multiple stages during the development process. Understanding the pros and cons of such techniques, most importantly being aware of practically possible approaches in the entire ecosystem, is critical in choosing the best framework and system application for different parts of building systems. Providing a wide overview of the state-of art in controls and building systems, providing guidance on developing an end-to-end system in relation to business fundamentals (distribution channels, stakeholders, marketing, supply-chain and financial management), the book is ideal for fourth-year control/mechanical/electrical engineering undergraduates, graduate students, and practitioners including business leaders concerned with smart building technology.
1 Building Systems 1.1 Introduction and Motivation 1.2 Building Types 1.2.1 Residential 1.2.2 Commercial 1.3 Building Systems 1.3.1 Overview: System Components and Functionality 1.3.2 HVAC Systems 1.3.2.1 AHU Systems 1.3.2.2 In-room Terminal Units 1.3.2.3 Heat Pumps 1.3.2.4 VRF (Variable Refrigerant Flow) Systems 1.4 Control System Architecture 1.5 Moving toward the Future: Smart/Intelligent Buildings 2 Sensing 2.1 Background and Overview 2.1.1 Characteristics 2.1.2 Analog vs. Digital 2.2 Virtual Sensors 2.2.1 Analytical 2.2.2 Empirical 2.3 Sensors Types and Availability in Buildings 2.3.1 Temperature Sensors 2.3.2 Pressure Sensors 2.3.3 Flow Rate Sensors 2.3.4 Speed Sensor 2.3.5 Electrical Sensors 2.3.6 Humidity Sensors 2.3.7 Light Sensors 2.3.8 Occupancy/Motion Sensors 2.3.9 Security Sensors 2.3.10 Air Quality Sensors 2.3.11 Outdoor Environmental Sensors 2.3.12 Position Sensors 2.3.13 Safety Sensors 2.3.14 Meters or Usage Sensors 2.3.15 Tracking Sensors 2.3.16 Other Sensors 3 Modeling 3.1 Modeling Approaches 3.1.1 White Box 3.1.2 Black Box 3.1.3 Grey Box 3.2 Modeling Process 3.2.1 Model Types 3.2.2 Order Reduction and Approximation 3.2.3 Calibration and Validation 3.3 Components and Systems 3.3.1 Fan 3.3.2 Chiller 3.3.3 Heat Exchanger 3.3.4 Pump 3.3.5 Damper 3.3.6 Thermal Models 3.3.7 Moisture and Humidity 3.3.8 Simulation Tools 3.4 Model Selection 4 Control 4.1 Control Product Types 4.2 Value of Control in Buildings 4.3 Control Approach 4.3.1 Centralized 4.3.2 Decentralized 4.3.3 Distributed 4.3.4 Hierarchical 4.3.4.1 Supervisory Control (SC) 4.4 Control Algorithms/Strategies 4.4.1 Bang-bang Control 4.4.2 Rule/Event-based Control 4.4.3 Finite State Machine (FSM) 4.4.4 PID (Proportional-integral-derivative) Control 4.4.5 Model Predictive Control (MPC) 4.4.6 Adaptive Control 4.4.6.1 Parameter Tuning 4.4.6.2 Reference Tuning 4.4.7 Economic control 4.4.8 Miscellaneous 4.5 Optimal Selection of Controls 5 Testing and Deployment 5.1 Test Bed Design 5.1.1 Simulation 5.1.2 Hardware-in-loop (HIL) 5.1.2.1 Controller-in-loop (CIL) 5.1.2.2 Equipment-in-loop (EIL) 5.1.3 Laboratory Testing 5.1.4 Field Demonstration 5.2 Product vs. Prototype vs. POC 5.3 Testing Methodology 5.3.1 Module-level 5.3.2 System-level 5.3.3 Feature-level 5.3.4 Other testing 5.4 Validation Mechanism 5.4.1 Eye-ball 5.4.2 Semi-automated 5.4.3 Fully-automated 5.5 Validation Criteria 5.6 Creating a Powerful Testing Infrastructure 5.7 Deployment 5.7.1 Packaging 5.7.2 Installation 5.7.3 Automatic Binding 5.7.4 Tracking 5.7.5 Update and Maintain 6 Control Use Cases, Artificial Intelligence, and Internet of Things 6.1 Control Use Cases 6.1.1 Precooling and Preheating 6.1.2 Ice/Cold-water Storage System 6.1.3 Duct Static Pressure Reset 6.1.4 Optimal Start/Stop 6.1.5 Night Purge Ventilation 6.1.6 Demand Control Ventilation (DCV) 6.1.7 Temperature Setback 6.1.7.1 Domestic Hot Water Temperature Reset 6.1.7.2 Zone Temperature Reset 6.1.7.3 SA Temperature Reset 6.1.7.4 Refrigeration/Freeze Temperature Reset 6.1.8 Daylight Harvesting 6.1.9 Automatic Lights Shutoff 6.1.10 Light Dimming 6.1.11 Occupancy-based Control 6.1.12 Natural Heating and Cooling 6.1.13 High-traffic Elevator Control 6.1.14 Fault Detection and Diagnostics (FDD) 6.1.15 Building-to-Grid Integration 6.1.15.1 Peak Shaving and Load Shifting 6.1.15.2 Community-level Resource Coordination 6.1.15.3 Frequency Regulation Service 6.1.15.4 Demand Response Programs 6.1.16 Retrofit Measures 6.2 Artificial Intelligence (AI) and Machine Learning (ML) 6.2.1 Role of AI and ML in Building Controls 6.3 IoT and Controls 6.3.1 Why Is IoT Attractive Now? 6.3.2 IoT Components 6.3.2.1 Big Data Handling 6.3.2.2 Communication Network and Protocol 6.3.2.3 Device Management 6.3.2.4 Platform 6.3.2.5 Data Privacy and Security 6.3.2.6 Applications and Use Cases 6.3.3 IoT Value and Opportunities in Buildings 6.3.4 IoT Challenges in Buildings 7 Stakeholders and Channels 7.1 Stakeholders 7.1.1 Occupant 7.1.2 Tenant 7.1.3 Owner 7.1.4 Facility Manager 7.1.5 Building Engineer and Building Operator 7.1.6 Consultant 7.1.7 Contractor 7.1.8 Brokers/Representatives 7.1.9 Technician 7.1.10 Utility and Government 7.1.11 Other 7.2 Distribution Channel 7.2.1 Direct Channel 7.2.2 Indirect Channel 7.2.3 Hybrid Channel 7.3 Channel Power and Conflicts 8 Product Marketing Management 8.1 Product Research and Segmentation 8.1.1 Product Market Research 8.1.2 Customer Segmentation and Targeting 8.1.3 Market Adoption Behavior 8.2 Competitive Analysis and Product Positioning 8.2.1 Positioning and Competitive Advantage 8.2.2 Monitoring Competition 8.2.3 Growth Strategy 8.3 Product Strategy 8.3.1 Product Selection and Introduction 8.3.2 Project Management 8.3.3 Pricing Strategies 8.3.4 Advertising 8.3.5 Product Stages 8.3.6 Attract and Retain Customers 8.4 Industry Characteristics 8.4.1 Life Cycle Stage 8.4.2 Market Volatility 8.4.3 Regulation and Policy 8.4.4 Barrier-to-entry and Investment Requirement 8.4.5 Competition and Concentration Level 8.4.6 Globalization 8.4.7 Technology Progressiveness 8.4.8 Dependency Level 8.4.9 Industry Structure using Porter’s Five Forces 8.5 Marketing Challenges and Opportunities in Building Controls 8.6 Growing Trends and Environmental Factors 9 Financial, Cost, and Supply Chain Management 9.1 Financial Concepts 9.1.1 Rate of Return and Interest Rate 9.1.2 Present Value vs. Future Value 9.1.3 Inflation 9.2 Project Selection-A Financial View 9.2.1 Return on Investment 9.2.2 Simple Payback Period 9.2.3 Net Present Value 9.3 Cost Management 9.3.1 Cost of Goods 9.3.1.1 Financial Factors 9.3.1.2 Non-financial Factors 9.3.2 Operational Expenses 9.3.2.1 Automation 9.3.2.2 Outsourcing 9.3.2.3 Workflow and Processes Optimization 9.3.2.4 Technology Adoption 9.4 Supply Chain Management 9.4.1 Supply Chain Management Example: Apple 9.4.2 Supply Chain Evolution: 1.0 to 5.0 9.4.3 Supply Chain Improvement Opportunities 9.4.4 Disruptions Preparation 9.4.5 Industrial Improvement and Impact 10 Controls Business Framework 10.1 Combined Technical and Business Perspective 10.1.1 Strategy and Marketing Management 10.1.2 Financial and Cost Management 10.1.3 Business Scenarios and Use Cases 10.1.4 Control Product/Services Development 10.1.5 Product Testing and Deployment 10.1.6 Building Systems and Iterative Improvement 10.1.7 Market Response and External Factors 10.2 Next-generation Building through Advanced Controls and Applications Alphabetical Index
Trade Policy 买家须知
- 关于产品:
- ● 正版保障:本网站隶属于中国国际图书贸易集团公司,确保所有图书都是100%正版。
- ● 环保纸张:进口图书大多使用的都是环保轻型张,颜色偏黄,重量比较轻。
- ● 毛边版:即书翻页的地方,故意做成了参差不齐的样子,一般为精装版,更具收藏价值。
关于退换货:
- 由于预订产品的特殊性,采购订单正式发订后,买方不得无故取消全部或部分产品的订购。
- 由于进口图书的特殊性,发生以下情况的,请直接拒收货物,由快递返回:
- ● 外包装破损/发错货/少发货/图书外观破损/图书配件不全(例如:光盘等)
并请在工作日通过电话400-008-1110联系我们。
- 签收后,如发生以下情况,请在签收后的5个工作日内联系客服办理退换货:
- ● 缺页/错页/错印/脱线
关于发货时间:
- 一般情况下:
- ●【现货】 下单后48小时内由北京(库房)发出快递。
- ●【预订】【预售】下单后国外发货,到货时间预计5-8周左右,店铺默认中通快递,如需顺丰快递邮费到付。
- ● 需要开具发票的客户,发货时间可能在上述基础上再延后1-2个工作日(紧急发票需求,请联系010-68433105/3213);
- ● 如遇其他特殊原因,对发货时间有影响的,我们会第一时间在网站公告,敬请留意。
关于到货时间:
- 由于进口图书入境入库后,都是委托第三方快递发货,所以我们只能保证在规定时间内发出,但无法为您保证确切的到货时间。
- ● 主要城市一般2-4天
- ● 偏远地区一般4-7天
关于接听咨询电话的时间:
- 010-68433105/3213正常接听咨询电话的时间为:周一至周五上午8:30~下午5:00,周六、日及法定节假日休息,将无法接听来电,敬请谅解。
- 其它时间您也可以通过邮件联系我们:customer@readgo.cn,工作日会优先处理。
关于快递:
- ● 已付款订单:主要由中通、宅急送负责派送,订单进度查询请拨打010-68433105/3213。
本书暂无推荐
本书暂无推荐